Read as a book

This part is a 5 min read. Turn the pages with the arrow keys or the mouse; the place you stop at is kept.

This part is a 5 min read. Turn the pages with a tap or a swipe.

Arknights: Endfield beginner guide, Part 3: Your first AIC line

For your first automated line, power a production facility from the PAC grid. Run a belt from the Depot to the facility’s input, then return the finished item to the Depot from its output.

Arknights: Endfield · Guide By: Published: 5 min read This article in Polish

A small factory with conveyors and a lattice tower stands on a rocky plateau, with immense ruins in the distance.

Key points

  • Pick one item you want the line to make, then choose the facilities that can turn your starting material into that item.
  • Each region starts with 200 power capacity at its PAC. Check how much the line needs before putting down a Thermal Bank to add more.
  • Production facilities have their own storage. To move an item to the next facility, connect the first facility’s output to the next one’s input with a transport belt.
  • Open Crafting from the Backpack panel to make items by hand, such as Buckflower Powder for restoring HP.

What does the AIC make, and why does your team need it?

For the previous part, see Arknights: Endfield beginner guide, Part 2: Classes and elements. The Automated Industry Complex, or AIC, is Endfield Industries technology for making smaller, modular industrial machinery. A small professional team can use those modules to set up a working automated line quickly. For your team, that means setting up the machines to do the production work instead of handling each batch yourself.

The facility categories tell you which part of the job a machine belongs to. Fitting Unit, Moulding Unit and Shredding Unit are Production I facilities, the category to look at when choosing a machine for a processing step. Electric Mining Rig and Fluid Pump are Resourcing facilities, on the supply side of the factory. If you already have the material your production step needs, start with that stock rather than building a separate resourcing setup for the same line.

How do you place the facilities for your first line?

  1. Find the Protocol Automation-Core, or PAC, which is the center of AIC activity in its region. Each region has one PAC, and a Sub-PAC shares the same regional features as the PAC. Use the regional core as the reference point when deciding where the line will go.
  2. Unlock the facility you want through the AIC Factory Plan. Facilities are constructions you place to do specific jobs for the factory, so choose one that does the processing you need. Once it’s unlocked, enter AIC mode while exploring and construct it from the Facility List.
  3. Lay out the line in the order material will pass through it. For a line with one processing step, set aside a route for materials coming in and another for the product going out. If the product needs a second processing step, place the second facility where you can run a belt between the two machines’ ports.
  4. Check Protocol Capacity if you’re placing facilities outside the PAC Area. This is a regional placement limit, and facilities outside that area use different amounts of it depending on what you place. If the region has reached its limit, you can’t add another facility there.

How do you power your first line?

  1. Work out the power demand of the facilities you’re going to run. Most facilities need electricity to operate, and different machines can need different amounts. Add up what the line needs rather than judging its demand by the number of machines you’ve placed.
  2. Check that the power route leads back to the PAC. Every facility on the regional power grid must ultimately connect to that core. Having enough capacity for a machine and getting power to that machine are separate checks, so don’t add capacity to solve a missing connection.
  3. Put a Relay Tower where it can supply the facilities that need power. This is the AIC facility that carries power out to machines across the region, with a reach of 80 meters in any direction from the tower. To acquire it, follow Basic AIC Plan - Basic AIC I - Power Relay. Check the tower’s reach against the position of the machines it needs to supply.
  4. Add a Thermal Bank if the line needs more power than the grid can provide. Its unlock is Basic AIC Plan - Basic AIC I - Power I. Once you’ve placed it and connected it to the grid, supply it with Originium Ore or batteries so it can generate electricity and raise the region’s power capacity. Both the Thermal Bank and the Relay Tower are AIC facilities in the Power category, so neither draws from the PAC’s power capacity.
  1. Find the output port on the machine that makes the first item in the chain. A transport belt attached to an output port takes items out automatically. Use that side of the facility as the start of the belt, not the port that receives its materials.
  2. End the belt at the input port of the facility that uses that item. Before adding another stage, check that the receiving machine takes what the first machine sends. A belt moves the item between the facilities; the next production step still needs the right material to do its job.

How do you feed the line from the Depot and store its output?

  1. Choose the material you’re going to supply from the Depot. This is the AIC’s storage for items such as facilities, gathered resources, factory products and items you can use. You can open it from a PAC or Sub-PAC, and either core can also act as a teleport point.
  2. Use the output port of the PAC or Sub-PAC to send stored material to the first machine’s input. The ports on both cores connect straight to the Regional Depot, so the material comes from regional storage rather than a separate stock inside the core. The Depot Loader and Depot Unloader are facilities whose ports also connect directly to that storage.
  3. Run the last machine’s output belt into an input that connects to the Regional Depot. This gives the finished item a destination without sending it through another production stage. On a one-machine line using the PAC for storage, the machine sits between the belt leaving the PAC and the belt returning to it.
  4. Check how much of the finished item is already stored before sending more in. The Depot has unlimited storage slots, but there’s a limit to how much it can hold of any one item. Room for other items doesn’t tell you whether there’s room for more of the product on this line.

What can you make by hand instead of automating?

Most Crafting products are Food & Medicine, though you can also make Planting Plots and Personal Devices. The menu has five sections: Planting, Transmute, Personal Device, EMS F&M and Fine F&M. Look for a formula for the item you need before setting aside facilities for it.

A Crafting formula requires one to three items, so use the formula to decide what to gather. For example, Buckflower is the material you turn into the HP-restoring powder. That’s a job you can do from the Crafting screen without routing the plant through your production line.

The Crafting Manual records the items you gather and tracks the total collected. When you’ve gathered enough resources, check it for rewards you can claim. Those rewards can include new Crafting formulas and upgrades to products, so the Manual is where you can pick up more ways to use what you collect.

Want to write or fix texts like this one? Join the editors

Sources

Share: XFacebookReddit

All news

Send the link to your PC

Kaption runs on a Windows PC. Send yourself the link and install it when you're at your computer.

Your link: https://kaption.one/?src=phone

On your phone right now:

Download the installer anyway (Windows, 177 MB)